Ergonomic Office Chair - Executive Reclining Swivel Chair

Colour: Grey Fabric
£139.99 £189.99

A Fabric Luxury Ergonomic Chair To Fit Your Body's Natural Curve, Perfectly!

Our ergonomic office chair, with its unique and flexible features, takes care of your posture, lower back, and stiff legs, delivering ultimate comfort. 

The fabric upholstery of swivel armchair provides a luxurious look yet a cosy and comfortable seating experience. 

This swivel armchair adds to the aesthetic of your work environment and helps you stay productive during long work hours, enhancing focus and serenity. 

Why Choose Our Luxury Ergonomic Office Chair?

Ergonomic Chair: S-curve design with neck, back, and lumbar support for optimal comfort.

Quality Materials: This ergonomic chair comes upholstered in linen, velvet, fur, or PU leather.

Adaptive Armrest Design: The armrests on this reclining chair adjust with you for added comfort.

Comfortable Footrest: Features a manual footrest to relax & tackle the sleeper feeling in your legs.

Foam Seating: Thick foam cushion padding all over; distribute overall weight evenly.

Reclining Office Chair: It can recline to a maximum 135-degree angle for more relaxation.

Customisable Height: Adjustable height up to 10 cm to fit your custom & workstation needs.

Swivel function: 360-degree complete rotation using 5 easy-glide rolling wheels.

Solid Build: High durability; this reclining chair can withstand a 120 kg load capacity.

Certified Lift Piston: Swivel armchair comes with an SGS-4 certified gas lift & locking function.

Colour Options: This luxury office chair comes in twelve colours, including black office chair. 

Lifestyle Video:


Payment & Security

Payment Methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Maestro
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

UP TO 75%OFF!

Get an EXTRA 25% off Xstriker Premium Gaming Chairs.